EOI Launched For Up To 5 GW Solar In India

Hindustan Salts Offering Land For Up To 5 GW Solar Power Capacity
Indian salt producers HSL and SSL want to utilize their unused land in Gujarat and Rajasthan to be used to produce solar power from up to 5 GW capacity. (Photo Credit: IndianSalt.com)
Indian salt producers HSL and SSL want to utilize their unused land in Gujarat and Rajasthan to be used to produce solar power from up to 5 GW capacity. (Photo Credit: IndianSalt.com)
Published on
  • HSL and its subsidiary SSL are offering land under their jurisdiction to be used for solar power production
  • HSL will provide land for up to 1 GW solar power capacity at Kharaghoda in Gujarat
  • SSL will rent land for up to 4 GW Ultra Mega Solar Power Plant at Sambhar Lake region in Rajasthan
  • Winning bidders will develop solar power capacity and pay rent for using land to HSL and SSL

A Government of India enterprise Hindustan Salts Limited (HSL) and its subsidiary Sambhar Salts Limited (SSL) have launched 2 separate expressions of interest (EOI) offering land for the development of up to 5 GW solar power capacity in Gujarat and Rajasthan.

SSL's EOI relates to land available for the execution of an Ultra Mega Solar Power Project of up to 4 GW capacity at Sambhar Lake region in Rajasthan. Of the 58,000 acres of land here, out of which 38,400 is lake area and SSL produces salt using some 2,500 acres. It intends to utilize a large area for solar power generation.

On the other hand, its parent HSL is offering land to interested developers for 1 GW solar power project to be built at Kharaghoda in Surendranagar district of Gujarat with the company providing its own land for the purpose.

Winners will develop, operate and generate revenue from the sale of generated power. They will arrange, obtain and maintain all requisite permits and approvals to construct, evacuate and grid connect the facility, along with signing power purchase agreements (PPA). In return, the developer will pay a fixed annual rental for the land provided by HSL and SSL on per acre basis.

Launched on November 27, 2021, last date to submit EOIs for both the tenders is December 13, 2021. Further details are available on HSL's website.

In 2017, the duo had launched an expression of intent (EOI) offering land at Kharaghoda and Sambhar for the development of 200 MW solar (see 200 MW PV Tender By Hindustan Salt Group).

Related Stories

No stories found.
logo
TaiyangNews - All About Solar Power
taiyangnews.info